Preventive Maintenance: Checklist
Preventive Maintenance as a checklist — concrete checks for owners before signing, at installation and every month.
Illustrated FCV configuration. View FCV-CSC-10G(V10) Snack & Drink Vending Machine. Confirm product fit and supplied options in your quotation.
- Independent owner guides
- Labelled worked examples
- Managed vs self-operated compared
Indicative model — the final machine is confirmed after a site survey or compatibility test.
Preventive Maintenance: an operational checklist for owners. This topic covers scheduled work and exclusions — the useful output is approved maintenance checklist. Work through the items in order — each one is a concrete check that turns an assumption into a verified fact.
Before you sign anything
Site survey completed
Demand, placement, power and permissions verified on site — not estimated from a photo.
Gross-sales definition read
You can state exactly which sales count, what is excluded and how the figure is calculated.
Responsibilities mapped
Every task — stocking, complaints, payments, maintenance, support — has a named owner in writing.
Exit terms understood
Contract term, notice and what happens to the machine and the arrangement at the end.
Installation checks
Position confirmed
The installed spot matches the surveyed and approved position.
Dispense test passed
Real products vended through every channel before sign-off.
Payment verified
Every payment method completes a real transaction; refund route tested.
Reporting live
Telemetry and statement feed confirmed working from day one.
Every month afterwards
Statement reconciled
Gross-sales definition, actual agreed share percentage, eligibility and settlement calculation verified against the written agreement.
Service record reviewed
Visits, restocks, faults and complaints from the period checked against expectations.
Range reviewed
Slow sellers flagged for replacement; demand shifts fed back into the product plan.
Issues escalated
Any breach of agreed service levels raised through the defined route.
The verification principle
approved maintenance checklist; commercial and legal approval; scenarios clearly labelled hypothetical. Every item on this checklist exists to replace an assumption with evidence — that is what keeps an owner in control.
Machines covered in this guide
Indicative models — the final recommendation follows a site survey and dispensing tests.
Machine guide / FCV-M059
Inside the FCV V10: six-tray example
This particular 352-piece mix is documented in the FCV machine guide. It is an example configuration, not a universal capacity for every product mix.
- Tray 1Tray 1 — Chips & popcorn
5 lanes × 6 units per lane
30 units
- Tray 2Tray 2 — Pastries, biscuits & savoury snacks
7 lanes × 6 units per lane
42 units
- Tray 3Tray 3 — Chocolate, wafers & nuts
10 lanes × 13 units per lane
130 units
- Tray 4Tray 4 — Soft drinks & juices
10 lanes × 5 units per lane
50 units
- Tray 5Tray 5 — Water, milk & sports drinks
10 lanes × 5 units per lane
50 units
- Tray 6Tray 6 — Canned soft & energy drinks
10 lanes × 5 units per lane
50 units
Example total: 352 units. Product packaging and the accepted layout determine the actual capacity.
| Tray | Product arrangement | Example units |
|---|---|---|
| 1 | Tray 1 — Chips & popcorn 5 spirals × 6 pieces = 30 pieces | 30 |
| 2 | Tray 2 — Pastries, biscuits & savoury snacks 7 spirals × 6 pieces = 42 pieces | 42 |
| 3 | Tray 3 — Chocolate, wafers & nuts 10 spirals × 13 pieces = 130 pieces | 130 |
| 4 | Tray 4 — Soft drinks & juices 10 spirals × 5 pieces = 50 pieces | 50 |
| 5 | Tray 5 — Water, milk & sports drinks 10 spirals × 5 pieces = 50 pieces | 50 |
| 6 | Tray 6 — Canned soft & energy drinks 10 spirals × 5 pieces = 50 pieces | 50 |
Frequently Asked Questions
Related Pages
Discuss My Ownership Agreement
Discuss your site and the ownership routes with our team — a consultation with a written proposal to follow.
Project enquiry · Ownership and service terms confirmed in writing